RORO skip hire acrossEnglandScotlandWales
0333 121 1056
Waste Types · Demolition

Demolition Waste Containers and Haulage

Soft strip, structural arisings and salvaged metals leave a demolition site by different routes. We arrange the containers and vehicles for each.

Demolition Waste 0333 121 1056
  • Licensed local partners across England, Scotland and Wales
  • Waste paperwork provided with every job
  • Free, no-obligation quotes
Get a Quick Quote

Demolition produces more waste per day than almost any other activity, and it comes in two very different forms. The soft strip, carried out before any structure is touched, removes ceilings, partitions, floor coverings, doors, services and fittings. It is bulky, mixed and comparatively light. Structural demolition then generates brick, concrete and steel, which are dense, largely recyclable and governed entirely by weight.

Treating both as one stream is the commonest planning mistake. Roll-on roll-off containers are the right tool for soft-strip waste and for segregated timber and metal. The heavy fraction mostly leaves by tipper or grab lorry, or is crushed on site by the demolition contractor for reuse. We arrange RORO container hire and haulage for each stage through licensed local partners, with the correct paperwork for every load.

Soft strip: volume first

Stripping a building back to its shell fills containers quickly. Suspended ceilings, stud partitions, carpet, joinery and ductwork take up a great deal of room for their weight, so the 35-yard and 40-yard RORO sizes are the usual choice, exchanged as often as the labour on site can fill them. Plasterboard from partitions has to be loaded into its own container. On multi-storey buildings, think about how waste reaches ground level and where the container sits in relation to the chute or hoist. A container placed too far from the drop point costs labour on every load.

Structural arisings and hardcore

Brick, block and concrete reach a vehicle’s legal weight limit long before a large container is full. Where the material is not being crushed and reused on site, it is normally loaded by excavator into tippers; our hardcore removal and 8-wheel tipper hire pages describe how that is arranged. A 20-yard RORO can be used part-filled where a container must be left for hand or small-machine loading. The 50-yard container has no role in structural demolition. If you intend to load a container by machine, say so when you enquire, as care is needed to avoid damaging it.

Recovering metal and timber

Structural steel, reinforcement, cable, pipework and plant have scrap value and a clear recycling route, so they are kept apart from the start. A dedicated scrap metal container, lockable if the site is unattended overnight, protects that value. Clean structural timber is likewise worth segregating. Painted or treated timber from older buildings may need assessing before it is consigned, and should be described accurately when you enquire so the load goes to the right facility. Reclaimable items such as bricks, slates and architectural features are usually set aside by the contractor for resale and never enter the waste stream at all.

Hazardous materials found in older buildings

A refurbishment and demolition asbestos survey is required before demolition begins, and the materials it identifies must be removed and consigned separately through an asbestos collection. Other items that must stay out of mixed containers include fluorescent tubes, old refrigeration and air-conditioning plant, oil tanks and their residues, and road surfacing containing coal tar. Each has its own page under specialist waste collections, and all hazardous loads travel under consignment notes rather than transfer notes. Share the survey findings with us early, because they shape the whole waste plan for the job.

Dust, mud and the road outside

Demolition sites are judged by the state of the highway at the gate. Sheeted loads, a planned vehicle route and regular sweeping keep complaints down, and a road sweeper can be arranged for the duration of the heavy haulage phase, subject to local availability. Containers must never be loaded above their top edge; they are netted or sheeted before leaving site. Agree where hook-loaders and tippers will wait, turn and load so that they are not queuing on the public road, and keep the container position away from the working face so exchanges can continue while demolition proceeds. Neighbours notice vehicle movements more than anything else on the job.

Accepted from demolition and strip-out

  • Ceiling tiles, grid and non-hazardous insulation
  • Stud partitions and joinery (plasterboard kept separate)
  • Carpet, vinyl and raised flooring
  • Doors, frames and timber
  • Ductwork, pipework and cable tray
  • Sanitaryware and ceramics within the weight limit
  • Brick and concrete in suitable small or part-filled containers

Needs a separate, specialist route

  • Asbestos in any form
  • Fluorescent tubes and light fittings with lamps
  • Refrigeration and air-conditioning units
  • Oil tanks, fuels and residues
  • Coal tar and contaminated soil
  • Gas cylinders and fire extinguishers
  • Electrical switchgear, batteries and other WEEE
  • Plasterboard mixed with other waste
These items can’t go in a standard RORO skip, but we can arrange a separate specialist collection.Get a quote →

Not sure? See our waste types guide or ask us when you book.

Typical projects

  • Building soft strip
  • Factory and warehouse demolition
  • Retail unit strip-out
  • School and hospital redevelopment
  • Site clearance before new build
  • Partial demolition and alterations

Demolition Waste – your questions answered

Can’t see your question? Call 0333 121 1056 or send us a message.

Is one large container enough for a whole demolition job?

Rarely. Soft-strip waste, plasterboard, metals and heavy arisings each need a different container or vehicle. A typical job combines large RORO containers for light mixed waste with tippers or small containers for hardcore. Give us the building type and floor area and we will propose a workable combination.

Can demolition rubble be crushed and kept on site?

Demolition contractors often crush clean brick and concrete for reuse as fill, which removes the need to haul it away. That is arranged by the contractor under its own permissions. We help with material that has to leave, and can arrange crushed concrete deliveries where a site needs more.

What information do you need to quote for demolition waste?

The site postcode, the type and age of building, the stages you need help with, any survey findings affecting the waste, and how vehicles get in and out. Photographs of the access and loading area are useful. Send them through get a quote.

Do old fluorescent light fittings count as general strip-out waste?

The metal fittings can go with scrap once the lamps are removed. The tubes themselves contain mercury and are hazardous, so they are boxed and collected separately through our fluorescent tubes service.

Often booked with Demolition Waste

Need more than one service for the same project? Add them to one enquiry and we’ll coordinate them together.

Get a quote

Get a Quick Quote

Tell us the site postcode, the waste, the container size if you know it, and when you need it. Mention exchanges, other sites or specialist waste and we will include them. Photos of the waste and the access help.

Prefer to talk? 0333 121 1056

ROROSkipHire.com is operated by Waste Cloud Ltd. Services are coordinated centrally and carried out by licensed local waste management and haulage partners across England, Scotland and Wales.